Project

General

Profile

Actions

Feature #307

open
NP NP

Canteen: D29 — wire D26 contracts + draft attender opt-in contract

Feature #307: Canteen: D29 — wire D26 contracts + draft attender opt-in contract

Added by Navya P. about 1 month ago. Updated about 1 month ago.

Status:
Resolved
Priority:
Normal
Assignee:
Target version:
-
Start date:
10/09/2026
Due date:
% Done:

0%

Estimated time:
Resolved By:

Description

Week 6 D29. Checkpoint on D26's two IPD contract branches (doctor-task,
intake-chart) -- implement Canteen's calling side against them directly
if the shape held, or a local outbox fallback if not yet reviewed.
Also draft one more contract: IAttenderReadContract (who opts into
meals), shape on nuvita-shared-kernel, real implementation on IPD.

Actions

Also available in: PDF Atom